(1) check whether there is any loose phenomenon on stainless steel water pump and pipeline and junction. Turn the stainless steel pump with the hand, and proved the stainless steel pump is flexible.
(2) to the bearing body join bearing lubrication oil, should observe the oil level in oil mark the centerline, lubricating oil should be timely replacement or supplement.
(3) unscrewing stainless steel pump body pump water diversion plug, water perfusion (or plasma).
(4) close out of the water gate and export of pipeline pressure gauge and imported vacuum gauge.
(5) the motor running, and proved the motor steering is correct.
(6) to start the motor, after the stainless steel pump operation, open the outlet pressure gauge and imported vacuum pump, it shows that the appropriate pressure, gradually open the gate valve, check the motor load condition at the same time.
(7) to control the capacity and head of the stainless steel pump, within the scope of the specified on the sign to ensure that the stainless steel pump running at peak efficiency, to achieve maximum energy saving effect.
(8) stainless steel pump in the process of operation, bearing temperature cannot exceed environment temperature 35 c, the highest temperature should not exceed 80 c.
(9) in case of abnormal sound of a stainless steel pump should immediately stop check.
(10) stainless steel pump to stop using, first close the gate valve, pressure gauge, then stop the motor.
(11) stainless steel pump in the first months of work, the oil change 100 hours, after every 500 hours, the oil change at a time.
(12) often adjust the packing gland, packing materials indoor drip situation is normal (in a drip out as appropriate).
(13) regularly check the wear condition of shaft sleeve, wear after the larger should be replaced in a timely manner.
(14) stainless steel pump when used in cold winter season, after stopping, the lower part of pump body must be drain plug unscrewed the net medium. To prevent the frost crack.
(15) stainless steel pump stopped for a long time, the pump must be opened entirely, dry moisture, rotating parts and junction are coated with grease packed, properly
没有评论:
发表评论